Seeliger Drilling Services

Abu Dhabi | United Arab Emirates

Technical Information

Why is it so difficult to drill an exact hole?

2021, Abu Dhabi, NBHH, 6 crossings, 5846 m drilling. Drilling for soil stabilization under the highway.

CONTACT

+971 50 6134264 

S.D.S. Office M 09, 1 Mshaybi St, Al Nahyan E25, Building with Galleria Cafe,  Abu Dhabi,  United Arab Emirates

Seeliger Drilling Services, founded on April 15, 2000, in the United Arab Emirates in Abu Dhabi by Joerg Frank Seeliger.

Our professional experience in Horizontal Directional Drilling began in March 1991 in Germany. In 2001, we built the first pedestrian tunnel in Abu Dhabi in cooperation with Bauer International.

SDS is an international company offering its engineering and consulting services worldwide. Especially in the HDD area, HDD tunnel construction and well construction.

Impressum

Copyright © 2021 SDS. All rights reserved.